This rear side extension consists of a steal structure with timber framing, we have now cut and pitched the roof ready for the next trade to come in and tile it.
We have also installed the joists and caberdek flooring on the 1st floor.
Next will be to get the outer walls erected and insulated.
If you are thinking about getting a renovation in your home, we’d love to hear about your project!